Traffic Notice 10-16 February: Southern Corridor Improvements

Welcome to the
traffic notice for the week of 10-16
February for the
Southern Corridor Improvements Project
Traffic notices provide a brief overview of likely
traffic disruptions for the following week. Full closures are also advertised
in the Weekend Herald. Traffic notices are complemented by monthly construction
updates and quarterly newsletters.
ALREADY IN PLACE
- Narrowed lanes and 80 km/h
speed limit northbound
between the Pahurehure Inlet and Hill Road.
- Narrowed lanes and 80 km/h
speed limit southbound
between Orams Road and the Pahurehure Inlet.
TRAFFIC NEXT WEEK
Northbound:
- Wednesday 15 February - Thursday 16 February - Night closure of the full northbound
motorway between the Takanini Interchange and Hill Road. This includes
closure of the northbound Takanini on-ramp (Great South Road).
Southbound:
- Sunday 12 February - Night closure of the full southbound
motorway between the Manukau Interchange through to the Takanini
Interchange. This includes closure of the Redoubt Road on-ramp, Lambie
Drive eastbound on-ramp, and SH20-1 Link.
- Monday 13 February - Night
closure of the southbound Takanini off-ramp (Great South
Road).
- Tuesday 14 February - Thursday 16 February - Night closure of the full southbound
motorway between the Takanini Interchange and the Papakura Interchange.
UPCOMING WORKS (dates may be
subject to change)
- Sunday 19 February - Thursday 23
February -
Night closure of the full northbound motorway between the
Papakura Interchange through to the Takanini Interchange. This includes
closure of the northbound Papakura on-ramps.
- Sunday 19 February - Night closure of a single
lane southbound on the motorway between Hill Road and
the Takanini Interchange.
- Sunday 19 February - Night closure of the southbound Takanini off-ramp (Great South Road).
- Monday 20 February - Thursday 23 February - Night closure of the full southbound motorway
between the Manukau Interchange through to the Takanini Interchange. This
includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound
on-ramp, and SH20-1 Link.
Night work on the motorway next
week will involve construction of a pier protection structure under the Hill
Road Bridge. We will install temporary traffic management to extend our
median safe work zone from the Pahurehure Inlet to the Papakura
Interchange. This includes narrowed lanes and a 80kph reduced speed
limit in place on the morning of Wednesday 15 February on the southbound side.
If it rains or ground conditions are too wet, work will be postponed until the
next available dry night.
Work during the night
will allow our crews to operate equipment safely while adjacent to the
existing traffic lanes. Work in the shoulder and median work zones will
continue during the daytime next week, but this will not affect traffic
movements.
Night closures are
typically from 9pm at night to 5am in the morning. Detours will be in
place to take motorists along local roads, leading back to the next motorway
interchange. All detours will be clearly signposted, and maps of the typical
routes can be found on our website at http://www.nzta.govt.nz/projects/southern-corridor-improvements/traffic-notices/. Please
allow extra
time for your journey at night.
With the lanes narrowed, there is
less time to react to other vehicles and it is important that motorists keep to
the 80 km/h speed limit past our work areas. There will be
ongoing truck and project vehicle movements accessing the shoulder and median
work sites. Keeping both motorists and our team members safe as possible is
imperative and we need everyone's help to do this.
As always, we will be doing our
best to minimise effects of these works on motorists as much as we can.
We thank you for your patience as
we work to improve journey reliability and safety along the Southern Corridor.
You can read more background
information and find out more about the project through our website, www.nzta.govt.nz/auckland-southern-corridor.
If you have any questions or queries, please
contact our team on free phone 0508 NZTA SCI (0508 698 2724) or email us at southerncorridor@nzta.govt.nz.
Also feel free to visit us at the Project Office located at 8 Great South Road,
Takanini.